- Set some mallets and fleshcutters asid3
- Set aside step ladder
- set aside broom and dustpan
- Layout all totes in numbered order
- Put tubs in totes according to their number
- close totes once complete
- Set aside boxes without a tote label until later
- Get gray dolly and stack all completed totes (2x3 totes)
- Put quick grab hardware (i.e. rivets) in tool boxes
- Move tool boxes out of pits
- Clip shelving zip ties
- Make stack of wood shelves
- Remove laptop and controllers from driver stations
- Pack controllers in special box
- Take sign off pit via step ladder (4 person job)
- Take down rest of structure
- stats box goes in trailer trunk
- media stuff stays with media car (tripod goes in trailer trunk)
- Sweep up pits